SATU MARE INTERNATIONAL AIRPORT

  • Status: Completed Project (2016) Design: ILS (Cat I, Cat II, GP INOP), VOR/DME Review: MSA, Circling
  • Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, Cat II, GP INOP), VOR/DME, MSA, Circling

MARAMURES INTERNATIONAL AIRPORT

  • Status: Completed Project (2019) Design: ILS (Cat I, II, ILS GP INOP), NDB/DME, NDB Review: MSA, Circling
  • Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, II, GP INOP), NDB, NDB/DME, MSA, Circling

DELTA DUNARII AIRPORT TULCEA

  • Status: Completed Project (2016) Design: ILS (Cat I, Cat II, GP INOP), VOR/DME Review: MSA, Circling

ORADEA INTERNATIONAL AIRPORT

  • Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, GP INOP), NDB, MSA, Circling

BRASOV INTERNATIONAL AIRPORT

  • Status: On-going Project Objective: Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)

ALEXANDRU PODGOREANU AIRPORT TUZLA

  • Status: On-going Project Design: VOR A, RNP APCH (LNAV, LNAV/VNAV, LPV), MSA, Circling

ROMEXPO AERONAUTICAL STUDY

  • Status: Completed Project (2020) Airport: BUCHAREST BANEASA International Airport Objective: Assessment of a project in development regarding the construction of a building complex Analysis: Procedures already published in AIP Romania (i.e., conventional and PBN SIDs/STARs, ILS (CAT I, II, GP INOP), NDB/DME on both runway ends, MRVA) Future IFPs (i.e., RNP APCH – LNAV, LNAV/VNAV, LPV on both runway ends)

PECINEAGA AERONAUTICAL STUDY

  • Status: Completed Project (2020) Airport: “MIHAIL KOGALNICEANU” CONSTANTA International Airport Objective: Assessment of a project in development regarding the construction of a wind park Analysis: Procedures already published in AIP Romania (i.e., conventional SIDs/STARs on both runway ends; MRVA; VOR)

FACAENI AERONAUTICAL STUDY

  • Status: Completed Project (2021) Airport: “MIHAIL KOGALNICEANU” CONSTANTA International Airport Airspace: En-Route Chart Lower-Airspace Objective: Assessment of a project in development regarding the construction of a wind park Analysis: AMA

BANAT AIRPORT CARANSEBES

  • Status: Completed Project (2020) Objective: Design of Aeronautical Charts for a new certified aerodrome Charts: Aerodrome Chart Visual Approach Chart – Aerodrome Circuit

GHIMBAV / IAR BRASOV HELIPORT

  • Status: On-going Project Objective: Update OF the published Aeronautical Charts Charts: Heliport Chart Visual Approach Chart – Aerodrome Circuit

ALEXANDRU PODGOREANU AIRPORT TUZLA

  • Status: On-going Project Objective: Update of the published Aeronautical Charts Charts: Aerodrome Chart Heliport Chart Visual Approach Charts – Aerodrome Circuit (on both runways)

BRASOV INTERNATIONAL AIRPORT

  • Status: Completed Project (2021) : Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)
  • Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), RNAV SIDs Design ILS (Cat I, Cat II, GP INOP), VOR, MSA, Circling

REMETEA

  • Status: On-going Project: Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)
TOP