Subscribe to our newsletter to receive the latest offers
TESTIMONIALS
“They (ref RAS Procedure Design) represent an essential element for air navigation service at Satu Mare Airport In terms of quality, we do appreciate an outstanding level, beyond the excellent cooperation we had with the entire RAS team
Mihai Patrascu, General Manager, Satu Mare Airport
“Instrument Flight Procedures Design and Charting Services provided by this company were highly appreciated at our Airport The entire team overcame with professionalism and accurately specific conditions that increased the difficulty of completing successfully the contracted services of IFP Design.”
Dorin Buda, CEO, International Airport of Maramures
“They have been a great asset within our collaboration, demonstrating professionalism and extensive knowledge not only in Procedure Design, but also in Air Navigation Services
Stoian Vilcu, General Manager, Tulcea Airport
“We are very pleased by the ongoing project we have awarded them through TED system designing and providing Conventional and PBN Flight Procedures. They have demonstrated proficiency by preparing serious and relevant documentation and services through the design process"
Adrian Vasilache, General Manager, Tuzla Aerodrome
SATU MARE INTERNATIONAL AIRPORT
Status: Completed Project (2016) Design: ILS (Cat I, Cat II, GP INOP), VOR/DME Review: MSA, Circling
Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, Cat II, GP INOP), VOR/DME, MSA, Circling
MARAMURES INTERNATIONAL AIRPORT
Status: Completed Project (2019) Design: ILS (Cat I, II, ILS GP INOP), NDB/DME, NDB Review: MSA, Circling
Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, II, GP INOP), NDB, NDB/DME, MSA, Circling
DELTA DUNARII AIRPORT TULCEA
Status: Completed Project (2016) Design: ILS (Cat I, Cat II, GP INOP), VOR/DME Review: MSA, Circling
ORADEA INTERNATIONAL AIRPORT
Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), Conventional SIDs Review: ILS (Cat I, GP INOP), NDB, MSA, Circling
BRASOV INTERNATIONAL AIRPORT
Status: On-going Project Objective: Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)
ALEXANDRU PODGOREANU AIRPORT TUZLA
Status: On-going Project Design: VOR A, RNP APCH (LNAV, LNAV/VNAV, LPV), MSA, Circling
ROMEXPO AERONAUTICAL STUDY
Status: Completed Project (2020) Airport: BUCHAREST BANEASA International Airport Objective: Assessment of a project in development regarding the construction of a building complex Analysis: Procedures already published in AIP Romania (i.e., conventional and PBN SIDs/STARs, ILS (CAT I, II, GP INOP), NDB/DME on both runway ends, MRVA) Future IFPs (i.e., RNP APCH – LNAV, LNAV/VNAV, LPV on both runway ends)
PECINEAGA AERONAUTICAL STUDY
Status: Completed Project (2020) Airport: “MIHAIL KOGALNICEANU” CONSTANTA International Airport Objective: Assessment of a project in development regarding the construction of a wind park Analysis: Procedures already published in AIP Romania (i.e., conventional SIDs/STARs on both runway ends; MRVA; VOR)
FACAENI AERONAUTICAL STUDY
Status: Completed Project (2021) Airport: “MIHAIL KOGALNICEANU” CONSTANTA International Airport Airspace: En-Route Chart Lower-Airspace Objective: Assessment of a project in development regarding the construction of a wind park Analysis: AMA
BANAT AIRPORT CARANSEBES
Status: Completed Project (2020) Objective: Design of Aeronautical Charts for a new certified aerodrome Charts: Aerodrome Chart Visual Approach Chart – Aerodrome Circuit
GHIMBAV / IAR BRASOV HELIPORT
Status: On-going Project Objective: Update OF the published Aeronautical Charts Charts: Heliport Chart Visual Approach Chart – Aerodrome Circuit
ALEXANDRU PODGOREANU AIRPORT TUZLA
Status: On-going Project Objective: Update of the published Aeronautical Charts Charts: Aerodrome Chart Heliport Chart Visual Approach Charts – Aerodrome Circuit (on both runways)
BRASOV INTERNATIONAL AIRPORT
Status: Completed Project (2021) : Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)
Status: On-going Project Design: RNP APCH (LNAV, LNAV/VNAV, LPV), RNAV SIDs Design ILS (Cat I, Cat II, GP INOP), VOR, MSA, Circling
REMETEA
Status: On-going Project: Consultancy services for the development of the Feasibility Study (concept of IFP and Airspace Design)